Stage A :- Treat the bottom surface and sides of the excavation made
for column pits. Wall trenches per square feet area.
Stage
B :-
Treat the refill earth on both sides of all build-up walls (approximate
width 30cm ) and depth 45cm of vertical surface of substructure.
Stage
C :- Treat the entire leveled surface (before laying the
floor) .in case of RCC framed struture with columns and plinth
beams and RCC basement, the treatment can starts at a depth
of 50cm below ground level.
Stage D :-The
treatment along the external & internal walls of entire
building below concrete and masonry apron & soil under existing floor
using chemical emulsion at per square feet including drilling & plugging
hole as per standard norms. Our squad will drill the hole, both side or
existing wall. We will drill the holes every one square feet on the inside
building & out side plinth area. We will close all
the holes at floor area. All plinth area spray by our chemical
emulsion
before laying
floor.
Stage E:- Treatment inside the building by chemical emulsion
(in oil/kerosene base solution) on all wodden work all the
wooden work in twice time as per standard norms& all walls
spray by chemical emulsions. We close the holes by white cement.